All trades of a data-centre build

A data-centre campus is built in three overlapping phases; the mechanical and electrical phase is the longest and needs the most people. Calculators are open for the electrician, welder and pipefitter. For every other trade, send your profile — we reply within one working day with the collective agreement that applies and a preliminary group range.

Phase one — the shell: structure and envelope

Phase two — mechanical and electrical: the longest and largest

MV/HV cable jointer

Terminations and joints on medium- and high-voltage cable; manufacturer-specific tests.

Phase three — commissioning and fit-out

Across all phases

Scaffolder

Erection and inspection of scaffolds and access platforms.

Crane operator

A regulated occupation in Finland — recognition of a foreign licence is arranged before placement.

What we do not place

General labourers from outside the EU; electrical installation as our own contract without a responsible electrical supervisor; work on refrigerant circuits without a Finnish qualification; crane operation on a foreign licence alone. Every requirement above is a requirement of the work — not of the person.